Feels like at least some of the challenge with cut-and-cover could be alleviated by choosing the right places that make using the technique more feasible.

For example, much of the east leg of Montreal's orange metro line serves and follows the rue Saint-Denis corridor, but runs under rue Berri, a small local street one block to the east. Similarly, the central portion of the green line serves and follows rue Sainte-Catherine (the city centre's primary retail street), but runs under boulevard de Maisonneuve a block to the north.

Imagine if Vancouver's Broadway extension were built cut-and-cover under Tenth Avenue instead of Broadway, with stairs and escalators opening onto Broadway (like at Broadway City Hall station), serving Broadway, but leveraging an easier alignment to deliver.

The level of disruption and impact of opening a trench on Berri/de Maisonneuve/Tenth would be much less than on the parallel main street, from a retail, existing bus transit, and of course vehicle traffic point of view. While there would of course be significant hardship and opposition from those side street residents, surely it would be an easier set of impacts to manage than on the main drag.

While this isn't a solution everywhere (not all street networks have a consistent parallel street), and there are of course impacts on secondary streets that are just as real, and perhaps if you need to acquire a tunnel boring machine for some of the route, you might as well use it the whole way, etc etc, but there can be location elements that might improve the viability of cut-and-cover.